The Distribution Network Operator (ORD) is the entity responsible for carrying out the meter reading.
The meter reading is carried out with a maximum frequency of 3 months.
The Distribution Network Operator (ORD) is the entity responsible for carrying out the meter reading.
The meter reading is carried out with a maximum frequency of 3 months.